MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA

MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA

This project work titled MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA has been deemed suitable for Final Year Students/Undergradutes in the Public Administration Department. However, if you believe that this project work will be helpful to you (irrespective of your department or discipline), then go ahead and get it (Scroll down to the end of this article for an instruction on how to get this project work).

Below is a brief overview of this Project Work.

Format: MS WORD  |  Chapters: 1-5  |  Pages: 75
MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA
 
ABSTRACT
Following widespread acceptance by researchers that the effects of qualitative/managerial construction time-influencing factors need to be considered in project scope-based construction time predicting models, several multivariate models combining project scope and qualitative/managerial factors have been developed. However, it has been shown in literature that the applicability of these models is clearly limited to the regions/countries where they were developed. This study was therefore aimed at developing a multivariate construction time predicting model that will be applicable to the Nigeria construction industry. A self-administered questionnaire survey was used to source information on the quantitative (project scope) factors considered in the study as well as to assess the extent of influence of the qualitative factors on construction time. Principal component regression was used for the data analysis and model development, using SPSS 16.0 for windows. Following a non-normal distribution of errors and a low R2 value obtained when multiple linear regression analysis was first conducted, the study’s data set was double log transformed and then partitioned/reclassified to account for public and private sector projects. Three models were developed following the multiple linear regression analysis repeated after transforming and partitioning/reclassifying the study’s data set. Two of these models (the public sector model and the private sector model) had high R2 values and were found after testing and validation, to be suitable for predicting construction time, while one of the models (the all projects model) had a low R2 value and was consequently found to be unsuitable for predicting construction time. The models with high R2 values serve as a useful tool to project managers and contractors for predicting construction time, thereby facilitating effective planning.
 
CHAPTER ONE
INTRODUCTION
1.1 Background to the study
The importance of ensuring accuracy and reliability of construction time estimates at the tendering stage cannot be overemphasized. Accurate early estimates of construction time typically provides clients and contractors with a basis for evaluating the success of a project and the efficiency of the project organisation (Nkado, 1995). They also provide them with a basis for ascertaining logistical and cash flow implications for feasibility, budgeting, planning, monitoring and even litigation purposes (Skitmore and Ng, 2003). Furthermore, they serve as a criteria in determining the best combination when performing time-cost optimization (Que, 2002). It is therefore clear that construction time has become a vital tool used by clients and contractors to ensure the success of construction projects. This success will however, only be achieved when construction time is accurately predicted.

==== The End ====

How to Download the Full Project Work for FREE

  • You can download the Full Project Work for FREE by Clicking Here.
  • On the other hand, you can make a payment of ₦5,000 and we will send the Full Project Work directly to your email address or to your Whatsapp. Clicking Here to Make Payment.

You Might Also Like