This project work titled DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N) has been deemed suitable for Final Year Students/Undergradutes in the Electrical & Electronics Department. However, if you believe that this project work will be helpful to you (irrespective of your department or discipline), then go ahead and get it (Scroll down to the end of this article for an instruction on how to get this project work).
Below is a brief overview of this Project Work.
Format: MS WORD
| Chapters: 1-5
| Pages: 65
DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N)
ABSTRACT
The most industrial and commercial process are depedent on electrical power in the event of power interpretation, the change-over of power supplied by a public utility to a generator is usually performed manually, often resulting in wastage time. Moreover, mechanic and some house hold appliances damages occurs because of human errors. These can cause significant losses. This paper presents a design and construction of an automatic single phase change over switches that electrical power supplying from public to generator is to event of a power outage or insufficient voltage. The system uses electromechanical devices for it’s operation.
CHAPTER ONE
INTRODUCTION
BACKGROUND OF THE STUDY
The need for sufficient power supply without much delay in switching to the alternative service brings about a system which can encounter the delay and losses that occurs in an event of public power failure.
However, power instability in developing countries creates need for automation of electrical power generation or alternative sources of power to back up the utility supply. This automation is required as the rate of power outage becomes predominantly high. Most households, industrial and commercial process department on power supply and the process of changeover are manual, series time is not only wasted but also creates devices or machine damage from human error during the change over connections, which could result in massive losses. This change over switch system separate the source between the generator and public supply, when there is power supply outage from the public supply, with the installation of this system at homes, offices or industries, no man power is required for changing the load line to generator line thus, when the power supply is restored, some one has to put off the generator while the system changes switches itself to the public supply.
ABSTRACT
The most industrial and commercial process are depedent on electrical power in the event of power interpretation, the change-over of power supplied by a public utility to a generator is usually performed manually, often resulting in wastage time. Moreover, mechanic and some house hold appliances damages occurs because of human errors. These can cause significant losses. This paper presents a design and construction of an automatic single phase change over switches that electrical power supplying from public to generator is to event of a power outage or insufficient voltage. The system uses electromechanical devices for it’s operation.
CHAPTER ONE
INTRODUCTION
BACKGROUND OF THE STUDY
The need for sufficient power supply without much delay in switching to the alternative service brings about a system which can encounter the delay and losses that occurs in an event of public power failure.
However, power instability in developing countries creates need for automation of electrical power generation or alternative sources of power to back up the utility supply. This automation is required as the rate of power outage becomes predominantly high. Most households, industrial and commercial process department on power supply and the process of changeover are manual, series time is not only wasted but also creates devices or machine damage from human error during the change over connections, which could result in massive losses. This change over switch system separate the source between the generator and public supply, when there is power supply outage from the public supply, with the installation of this system at homes, offices or industries, no man power is required for changing the load line to generator line thus, when the power supply is restored, some one has to put off the generator while the system changes switches itself to the public supply.
How to Download the Full Project Work for FREE
- You can download the Full Project Work for FREE by Clicking Here.
- On the other hand, you can make a payment of ₦5,000 and we will send the Full Project Work directly to your email address or to your Whatsapp. Clicking Here to Make Payment.