This project work titled ASSESSMENT OF THE EFFECTIVENESS OF ENVIRONMENTAL SANITATION IN THE CONTROL OF MALARIA has been deemed suitable for Final Year Students/Undergradutes in the Environmental Science Department. However, if you believe that this project work will be helpful to you (irrespective of your department or discipline), then go ahead and get it (Scroll down to the end of this article for an instruction on how to get this project work).
Below is a brief overview of this Project Work.
Format: MS WORD
| Chapters: 1-5
| Pages: 70
ABSTRACT
This study was conducted to determine the effectiveness environmental sanitation practices on malaria prevention and control in Abeokuta metropolis, Ogun State, Nigeria. A descriptive cross-sectional study design was adopted for the study; A pre-tested structured questionnaire was used to generate data from 450 adult respondents who were selected using multi-stage sampling technique. An observational checklist was used to assess the sanitary condition of residential dwellings and facilities. Data generated was entered into excel spread sheet and exported to Statistical Package for Social Sciences (SPSS version 20.0) software for analysis. Results were presented in frequencies, tables and charts. Chi-square was used to test for association between variables at 0.05 α level. It was revealed that 283 (62.9%) respondents exhibited poor environmental sanitation practices while 167 (37.1%) had good environmental sanitation practices. It also was observed that age (p=0.023), gender (p=0.000), educational status (p=0.000) and income (p=0.000) were found to be statistically significantly associated with environmental sanitation practices. Hence, malaria intervention programmes should be redesigned or remodeled to include the core components of environmental sanitation to prevent mosquito breeding and mitigate malaria transmission in rural areas.
How to Download the Full Project Work for FREE
- You can download the Full Project Work for FREE by Clicking Here.
- On the other hand, you can make a payment of ₦5,000 and we will send the Full Project Work directly to your email address or to your Whatsapp. Clicking Here to Make Payment.