This project work titled ANALYSIS OF BORE-HOLE WATER QUALITY OF COMMMUNITIES has been deemed suitable for Final Year Students/Undergradutes in the Biochemistry Department. However, if you believe that this project work will be helpful to you (irrespective of your department or discipline), then go ahead and get it (Scroll down to the end of this article for an instruction on how to get this project work).
Below is a brief overview of this Project Work.
Format: MS WORD
| Chapters: 1-5
| Pages: 79
ANALYSIS OF BORE-HOLE WATER QUALITY OF COMMMUNITIES
ABSTRACT
The quality of water used for domestic purposes from three boreholes in Wudil Local Government (KUST Wudil, Unguwar Danya and Unguwar Fulani) was analyzed and assessed for a period of five weeks using standard methods of sampling and laboratory analysis. Parameters tested include pH dissolved oxygen (DO), five-day biochemical oxygen demand (BOD5), nitrate ion (NO3), conductivity, hardness, temperature total dissolved solids (TDS) and turbidity. Results showed that there are significant differences between the different wards. However, a one-way ANOVA conducted reveals significant difference (p < 0.05) between the different sites and physicochemical parameters. It is therefore recommended that government should be more effective in controlling the point source of pollution in the area.
ABSTRACT
The quality of water used for domestic purposes from three boreholes in Wudil Local Government (KUST Wudil, Unguwar Danya and Unguwar Fulani) was analyzed and assessed for a period of five weeks using standard methods of sampling and laboratory analysis. Parameters tested include pH dissolved oxygen (DO), five-day biochemical oxygen demand (BOD5), nitrate ion (NO3), conductivity, hardness, temperature total dissolved solids (TDS) and turbidity. Results showed that there are significant differences between the different wards. However, a one-way ANOVA conducted reveals significant difference (p < 0.05) between the different sites and physicochemical parameters. It is therefore recommended that government should be more effective in controlling the point source of pollution in the area.
How to Download the Full Project Work for FREE
- You can download the Full Project Work for FREE by Clicking Here.
- On the other hand, you can make a payment of ₦5,000 and we will send the Full Project Work directly to your email address or to your Whatsapp. Clicking Here to Make Payment.